Here you find some realisations concerning wastewater purification and water treatment. Besides these built installations, numerous studies, pilot tests and follow-up or exploitation assignments were executed. For the complete list of references for each sector we are pleased to refer to our general reference list. It is prohibited for third parties to use this reference list for commercial purposes

Suiker Unie - Dinteloord (NL) - Biological wastewater treatment plant

Additional clarifier biological wastewater treatment plant
Capacity: 370 m³/h

Additional clarifier biological waste water treatment

Lanxess - Antwerp - Biological wastewater treatment plant

Extension aeration capacity
Capacity: 2 x 2125 Nm³/h
Operational since 04/2014

Project in the spotlight

Biological water treatment

... and (nearly) all installations

Aerobe waterzuivering

Alco Bio Fuel - Ghent

Aerobic wastewater treatment
Expansion capacity wastewater treatment station
Operational since 10/2016

 

Chevron Lubricants - Ghent

Hydrocarbon separator 
Capacity: 375 m³/h
Operational since 08/2016

Galloometal  - Menen

Adaptation filters wastewater treatment
Operational since 07/2016

Unilin Industries - Wielsbeke

Expansion granulation proces by placement of a second hydrocyclon
Capacity: 100 m³/h
Operational since 07/2016

Biologische waterzuivering

Browar Fortuna - Miloslaw (PL)

Biological wastewater treatment plant
Expansion capacity: 250 m³/d
Operational since 07/2016

Karel Sterckx - Roeselare

Placement aeration panels
Capacity: 780 Nm³/h
Operational since 01/2016

Van Honsebrouck - Ingelmunster

Construction of a biological wastewater treatment plant
Capacity: 280 m³/d, 1,1 tons of COD per day
Operational since 08/2015

Project in the spotlight

Biological water treatment: NDN-version

EOC - Oudenaarde

Biological wastewater treatment plant: NDN-version
Capacity: 700 m³/d - 587 kg COD/d - 98 kg N/d
Operational since 08/2015

Biological water treatment

Baxter - Lessines

Expansion aeration capacity biological wastewater treatment plant
Capacity: from 2,5 to 3,25 tons of COD per day
Operational since 08/2015

Biological water treatment - Hydrocyclon for separation granular sludge

Unilin industries - Wielsbeke

Hydrocyclon for separation granular sludge
Capacity: 50 m³/h
Operational since 08/2015

Biological water treatment

Galactic - Escanaffles

Expansion biological wastewater treatment plant with clarifier
Capacity: 30 m³/h
Operational since 07/2015
aeration Biological water treatment municipal sewage

INASEP - Warnant

Aeration biological treatment plant for municipal sewage
Capacity: 700 IE
Operational since 06/2015

Biological water treatment

Browar Fortuna - Miloslaw (PL)

Biological wastewater treatment plant
Capacity: 100 m³/d - 400 kg COD/d
Operational since 03/2015

Project in the spotlight

Umicore - Olen

Physicochemical wastewater treatment plant for the removal of specific heavy metals
Capacity: 650 m³/h
Operational since 02/2015

Treatment rain water

Brussels Airport - Zaventem

Treatment of rain water: refurbishment of oil separator
Capacity: 1500 m³/h
Operational since 02/2015

physicochemical waste water treatment

Allbox - Harelbeke

Physicochemical treatment of ink wastewater and glue recuperation plant
Capacity: 10 m³/d
Operational since 01/2015

Biological water treatment

Du Pont Genencor - Brugge

Biological wastewater treatment plant: NDN-version, Bio-P-removal, optimisation - full control 24/7
Capacity: 1450 m³/d – 5 tons COD/d – 400 kg N/d – 100 kg P/d
Operational since 11/2014

Biological water treatment

Suiker Unie - Dinteloord (NL)

Expansion biological wastewater treatment plant with additional clarifier
Capacity: 370 m³/h
Operational since 08/2014

 Biological water treatment in container form

U.P.C. Bierbeek

Complete biological wastewater treatment plant in container version
Capacity: 200 m³/d
Operational since 06/2014

Project in the spotlight

Biological water treatment

Lanxess - Antwerpen

Expansion aeration capacity biological wastewater treatment plant
Capacity: 2 x 2125 m³
Operational since 04/2014

Project in the spotlight

Biological water treatment

Leiestroom - Menen

Biological aftertreatment of digestate of a biogasinstallation
Capacity: 4.5 MW - 100 000 tons/y
Operational since 12/2013

Physicochemical treatment terminal waste water in containers

SEA-invest - Abidjan (CI)

Physicochemical treatment terminal wastewater in containers
Capacity: 15 m³/h
Operational since 08/2013

Project in the spotlight

View project fiche (pdf)

Biological water treatment

Brasserie Bralico - Brazzaville (CG)

Biological wastewater treatment plant
Capacity: 1200 m³/d
Operational since 05/2013

Biological water treatment

La Nitruration Moderne - Luik

Physicochemical wastewater treatment plant: CN/Cr-detoxification and removal of heavy metals, mobile version in container
Capacity: 5 m³/h
Operational since 03/2013

Biological water treatment in mobile containers

Browar Fortuna - Miloslaw (PL)

Biological wastewater treatment in mobile containers
Capacity: 30 m³/d
Operational since 11/2012

 
Biological treatment of filtrate maintenance dredging

SeReAnt - Antwerp

Biological treatment of dredging sludge filtrate
Capacity: 250 m³/h
Operational since 12/2011

View project fiche (pdf)

Biological water treatment

Beneo Orafti - Oreye

Biological wastewater treatment plant
Capacity: 10 tons COD/d - 500 kg N/d
Operational since 10/2011

Biological water treatment

Galloometal - Menen

The biological SBR got modified for continous treatment. The treated water is reused after sand filtration and disinfection.
Capacity: 1600 m³/d
Operational since 10/2011

Biological treatment Run-off water in containers

Galloo Brugge - Bruges

Biological treatment run-off water in containers
Capacity: 20 m³/h
Operational since 08/2011

biological water treatment

UNIBRA Brasserie des Mille Collines - Kigali (RW)

A biological wastewater treatment plant was designed and built for the new brewery. The remote monitoring is performed from Belgium.
Capacity: 200 m³/d
Operational since 07/2011

Building of treatment ground water

DEC - SITA - VOLKER STEVIN - Chesterfield (UK)

Construction of a ground water treatment plant
Capacity: 20 m³/h
Operational since 01/2011

Physicochemical rain water treatment for reuse

EWI - Kluisbergen

Physicochemical rain water treatment for reuse
Operational since 11/2010

biological water treatment

Brussels Airport - Zaventem

Realisation and follow up of the biological wastewater treatment plant
Capacity: 2400 m³/day
Operational since 09/2010

View project fiche (pdf)

Biological water treatment for dichloro-methane removal

BSN Medical - Vibraye (FR)

Biological wastewater treatment plant in container version for specific dichloro-methane removal
Capacity: 15 m³/d
Operational since 08/2010

Biological water treatment - Lamella seperator

ITC - Tielt

Lamella seperator
Capacity: 50 m³/h
Operational since 07/2010

Biological water treatment

Cooreman - Dendermonde

Construction of a biological wastewater treatment plant with N & P-removal
Capacity: 850 m³/d
Operational since 02/2010

Treatment and recycling of rinse water in surface treatment line via selective ion exchange

Thermic Engineering International - Zaventem

Treatment and recycling of rinse water in surface treatment line by means of selective ion exchange
Capacity: 7 m³/h
Operational since 01/2010

Biological water treatment

Antonio Vleeswaren - Gavere

Biological wastewater treatment plant
Operational since 07/2009

Biological water treatment - construction of screw jack

Sopraco - Geel

Construction of a screw jack
Operational since 06/2009

Treatment process cooling water with selective ion exchange

Deceuninck - Hooglede

Treatment process cooling water by means of selective ion exchange
Capacity: 5 m³/h
Operational since 03/2009

Construction of Biological water treatment

Rozendaal - La Madeleine (FR)

Construction of a biological wastewater treatment plant
Operational since 03/2009

Construction of Biological water treatment

DMG - Gouvieux (FR)

Construction of a biological wastewater treatment plant
Operational since 03/2009

Biologiocal water treatment - Ultrafiltration of inkt water

Pacapime - Mórahalom (HU)

Ultrafiltration of ink water

Capacity: 210 l/h
Operational since 02/2009

Expansion and optimalisation biological water treatment

Baxter - Lessines

Expansion and optimisation biological wastewater treatment plant
Capacity: 2000 m³/d
Operational since 02/2009

Expansion of Biological water treatment with sand filter

Galloometal - Menen

Expansion of a biological wastewater treatment plant with sand filter
Operational since 12/2008

Construction of Biological water treatment

BioWanze - Wanze

Construction of a biological wastewater treatment plant
Capacity: 830 m³/h
Operational since 10/2008

Biological water treatment

Lano - Stasegem

Aerated egalisation tank
Operational since 09/2008

Biological water treatment

General Motors Belgium - Antwerpen

Optimisation wastewater treatment plant
Operational since 08/2008

Mobile water treatment installation

Vopak Terminal ACS - Antwerpen

Mobile water treatment installation
Operational since 07/2008

Expansion water treatment

Hot Cuisine - Doornik

Expansion wastewater treatment
Operational since 04/2008

Construction of Biological water treatment

Du Pont de Nemours - Mechelen

Construction of a biological wastewater treatment plant
Operational since 09/2007

Construction of Biological water treatment

EOC Latex Division - Evergem

Construction of a biological wastewater treatment plant
Operational since 06/2007

Biological water treatment

EWI - Kluisbergen

pH neutralisation
Operational since 04/2007

Biological water treatment

Ardo - Ardooie

Replacement aeration system
Operational since 04/2007

Biological water treatment - Renewalprocess tanks oxidation basin

Arcelor Steel Belgium - Ghent

Refurbishment process tanks oxidation basin
Operational since 01/2007

Construction of Biological water treatment

Verhaeghe-Vandewynckele (La Lys) - Halluin (FR)

Construction of a biological wastewater treatment plant
Operational since 12/2006

Biological water treatment - Lamella separator

Umicore - Olen

Lamella separator
Operational since 11/2006

Optimalisation water treatment

Puratos - Groot-Bijgaarden

Optimisation biological wastewater treatment plant
Operational since 09/2006

Optimalisation aerobe sludge mineralization

Algist Bruggeman - Ghent

Optimisation aerated sludge mineralisation tank
Operational since 06/2006

Biological water treatment - Modifications aeration system

Lotus Bakeries - Lembeke

Modifications aeration system
Operational since 05/2006

Mobile water treatment

Ethypharm - Grand Quevilly (FR)

Mobile wastewater treatment plant
Capacity: 30 m³/d
Operational since 04/2006

 

Mobile water treatment

Ethypharm - Chateauneuf en Thymerais (FR)

Mobile wastewater treatment plant
Capacity: 25 m³/d
Operational since 04/2006

Expansion and optimalisation water treatment

Van Landschoot - Adegem

Expansion and optimisation wastewater treatment
Operational since 02/2006

Biological water treatment - Construction of aerated buffer

Stock & Courtens - Kortrijk

Construction of aerated buffer
Operational since 07/2005

Optimalisation water treatment

Locks - Ghent

Optimisation wastewater treatment
Operational since 04/2005

Biological treatment of process waste water

Agfa - Pont à  Marcq (FR)

Biological treatment of process waste water
Operational since 02/2005

Construction of and monitoring physicochemical waste water treatment

Asco Industries - Zaventem

Construction and monitoring of physicochemical wastewater treatment plant for fluoride and heavy metal removal
Capacity: 10 m³/h
Operational since 12/2004

Construction of water treatment

Total - Minderhout

Construction of wastewater treatment plant
Operational since 12/2004

Mobile solution for pH-neutralisation and physicochemical waste water

Quinn Group Belgium - Grobbendonk

Mobile solution for pH-neutralisation and physicochemical wastewater treatment
Operational since 10/2004

Construction of water treatment

Tops Foods - Olen

Construction of wastewater treatment plant
Operational since 08/2004

Biological water treatment

Volvo Cars - Gent

Closing the rinse cycle after phosphate by reverse osmosis
Capacity: 5 m³/h
Operational since 05/2003

Lu General Biscuits - Herentals

Construction of wastewater treatment plant
Operational since 11/2002

Snack Food Poco Loco - Roeselare

Construction of flotation
Operational since 11/2002

 

Monks International - Wielsbeke

Construction of a biological wastewater treatment plant
Operational since 01/2002

UCO Sportswear - Ghent

Construction of a biological wastewater treatment plant
Operational since 01/2002

Continental Teves - Mechelen

Vacuum evaporator with reuse of condensate
Capacity: 200 l/h
Operational since 11/2001

Total - Jabbeke

Construction of a biological wastewater treatment plant
Operational since 11/2001

Bekaert Decoration Textiles - Oudenaarde

Construction of a biological wastewater treatment plant
Operational since 11/2000

Arma - Verviers

Construction of a biological wastewater treatment plant
Operational since 01/2000

Colruyt Vlevico - Huizingen

Construction of a biological wastewater treatment plant
Operational since 11/1998

Slachthuis Cooreman Verhasselt - Dendermonde

Construction of a biological wastewater treatment plant
Operational since 11/1998

ITC - Tielt

Construction of a biological wastewater treatment plant
Operational since 01/1997

LWZ - Lendelede

Construction of a biological wastewater treatment plant
Operational since 11/1996

Van Dalen - Geel

Construction of a physicochemical wastewater treatment plant
Operational since 11/1994